When a CPSR is considered vital, the ACO is required to evaluate the contractor’s system from the eleven requirements outlined in FAR forty four. (b) In assessing the acceptability with the contractor’s purchasing system, the contracting officer, in session With all the purchasing system analyst or auditor, shall ascertain whether https://eduardoqdnwe.loginblogin.com/41038027/top-latest-five-cpsr-urban-news